- 0.0% increase to the total Village tax levy and water utility rates.
- 10.0% decrease in General Transportation Aid from the State.
- $19,709 in Local Road Improvement Program revenue from the State for road resurfacing.
- 0.0% change to fees for contracted fire/EMS, auditor, assessments, household hazardous waste collection and public health.
- 1.4% increase to Johns Disposal in accordance with the Village’s contract.
- 2.5% base increase budgeted for staff wages; actual individual wage rates to be set by resolution of the Village Board.
- $246,073 for road resurfacing on Campus Dr. (between Main St. and Deepwood Dr.) and Wind Point Rd. (between Park Pl. and end of the public section).
- $30,000 for road maintenance and striping on Four Mile Rd., Lighthouse Dr., Three Mile Rd. and Lake Meadow Dr.
- 183 additional police officer hours for an added hour of daily police coverage during the months of September-May.
- $9,000 for exterior rehab of the Case 521 loader.
- $25,000 to replace the water utility van that was purchased in 1999.
- $13,000 to replace the park riding lawn mower that was purchased in 1999.
- $10,000 for grounds improvement planning at lighthouse and $65,000 for initial plan implementation.
- $25,000 for the first phase (of three) of a water utility dead-end valve replacement program.
Quick Links
Proposed 2018 Village Budget Includes 0% Property Tax Increase
Latest News
Calendar
December 2024 |
||||||
---|---|---|---|---|---|---|
Sun | Mon | Tue | Wed | Thu | Fri | Sat |
1
|
2
|
3
|
4
|
5
|
6
|
7
|
8
|
10
|
11
|
12
|
13
|
14
|
|
15
|
16
|
17
|
18
|
19
|
20
|
21
|
22
|
24
|
25
|
26
|
27
|
28
|
|
29
|
30
|
31
|